{"page":{"id":100,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://inkhug.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-10-29\">October 29, 2026</time></p>\n<section class=\"policy-summary\">\n<h2>Changes and cancellations at a glance</h2>\n<ul>\n<li><strong>Window:</strong> within 24 hours of placing your order, you can cancel it or change the details.</li>\n<li><strong>Cost:</strong> no fee for cancelling or changing within 24 hours. A cancellation is refunded in full.</li>\n<li><strong>What you can change:</strong> names, dates, photo links, product size or style, and the shipping address.</li>\n<li><strong>How:</strong> email <a href=\"mailto:support@inkhug.shop\">support@inkhug.shop</a> with your order number and the change, written exactly as it should be printed.</li>\n<li><strong>After 24 hours:</strong> the order may already be printing. You can still return it within 60 days of delivery, with return postage paid by us.</li>\n</ul>\n</section>\n<p>Everything Ink Hug sends out is printed for one person: a name on a pillow, a photo on a blanket, a wedding date on a cover. Because we start printing soon after an order comes in, the first 24 hours are the time to make changes. This page explains what can be changed, how to ask, and what happens when the window has passed.</p>\n<h2>1. The 24-hour window</h2>\n<p>You have 24 hours from the time your order is placed to cancel it or change it. The time on your order confirmation email is the starting point. Within that window, any change you ask for by email is free, and a cancellation is refunded in full to your original payment method.</p>\n<p>Why 24 hours? Our processing time is 1–3 business days, and many orders move into printing on the next working day. The 24-hour window gives you a full day to re-read your order notes, check spellings with family, and change your mind, while still letting us keep our processing promise for everyone.</p>\n<h3>Weekends and holidays</h3>\n<p>The window is 24 hours by the clock, not by business days. If you order on a Saturday morning, email us by Sunday morning. We read every email in the order it arrived, and a request sent within 24 hours of ordering counts even if we answer it on the next business day.</p>\n<h2>2. What you can change</h2>\n<table class=\"policy-table\">\n<caption>Changes we can make within 24 hours of ordering</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Possible within 24 hours?</th>\n<th scope=\"col\">What to send us</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Spelling of a name or wording</td>\n<td>Yes</td>\n<td>The full corrected text, exactly as it should be printed</td>\n</tr>\n<tr>\n<td>A date or its format</td>\n<td>Yes</td>\n<td>The date written the way you want it, for example 06.14.2025</td>\n</tr>\n<tr>\n<td>Photo</td>\n<td>Yes</td>\n<td>A new share link, or the file attached to your email</td>\n</tr>\n<tr>\n<td>Product size or style</td>\n<td>Yes</td>\n<td>The new size or style; we explain any price difference</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>Yes</td>\n<td>The full new address, including unit number and postcode</td>\n</tr>\n<tr>\n<td>Add an item</td>\n<td>Place a new order</td>\n<td>Mention both order numbers if they should ship together</td>\n</tr>\n<tr>\n<td>Cancel the whole order</td>\n<td>Yes</td>\n<td>The word &#8220;Cancel&#8221; and your order number</td>\n</tr>\n</tbody>\n</table>\n<h2>3. How to ask for a change</h2>\n<ol>\n<li>Email <a href=\"mailto:support@inkhug.shop\">support@inkhug.shop</a> from the address you used at checkout.</li>\n<li>Use the subject &#8220;Change order&#8221; plus your order number, for example &#8220;Change order 1042&#8221;.</li>\n<li>Write the change clearly. For text, give the whole line as it should appear, not just the letter that is wrong. &#8220;Please print: Ava &amp; Theo 06.14.2025&#8221; is clearer than &#8220;the A should be lowercase&#8221;.</li>\n<li>If the order has more than one item, name the item the change applies to.</li>\n<li>Wait for our confirmation. A change is only final when we reply to confirm it. We reply within 24 hours on business days.</li>\n</ol>\n<p>Please do not place a second order to replace the first one without telling us. Two orders with similar notes can both be printed, and untangling them takes longer than a simple email.</p>\n<h2>4. How to cancel</h2>\n<p>To cancel, email us within 24 hours of ordering with the subject &#8220;Cancel&#8221; and your order number. We confirm the cancellation by email and refund the full amount to your original payment method within 7 days of that confirmation. You do not need to give a reason, though we are always glad to hear if something on the site was unclear.</p>\n<p>If you cancel because you made a mistake in the order notes, consider asking for a change instead. A change keeps your place in the processing queue, which helps when a gift date is close.</p>\n<h2>5. After the 24-hour window</h2>\n<p>Once 24 hours have passed, your pillow or blanket may already be printed or packed. We cannot promise a change after this point. Here is what you can still do:</p>\n<ul>\n<li><strong>Ask anyway.</strong> If the order has not been printed, we will still try. We will tell you honestly whether it was possible.</li>\n<li><strong>Change the address in transit.</strong> After the parcel ships, we can ask the carrier to redirect it. This is not always possible and depends on the carrier.</li>\n<li><strong>Return it.</strong> Every order can be returned within 60 days of delivery for any reason, including a change of mind, and we pay return postage with a free label. See <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges</a>.</li>\n<li><strong>Exchange it.</strong> If the text was wrong in your notes, a return can become an exchange: we print a corrected piece and ship it free.</li>\n</ul>\n<h2>6. Changes we make ourselves</h2>\n<p>Sometimes we contact you instead. That happens when a photo link does not open, when a photo looks too small to print sharply at the size you chose, when the notes do not say which name goes on which item, or when the notes are empty for a personalized product. In those cases we pause the order and email you. Processing restarts when you reply. If we cannot reach you, the order stays paused; we do not guess names or choose photos on your behalf.</p>\n<h3>Why we do not send proofs</h3>\n<p>Ink Hug does not send a proof or mockup before printing. That keeps processing to 1–3 business days and avoids orders waiting on approval emails. The flip side is that the order notes are your design brief, and we print what they say. The 24-hour change window and the 60-day return policy are there to catch the mistakes everyone makes now and then.</p>\n<h2>7. Where your order is in its first days</h2>\n<p>It helps to know what is happening to your order while you decide whether to change something. This is the usual path of an Ink Hug order from checkout to the carrier.</p>\n<table class=\"policy-table\">\n<caption>Order stages and whether a change is still possible</caption>\n<thead>\n<tr>\n<th scope=\"col\">Stage</th>\n<th scope=\"col\">What we are doing</th>\n<th scope=\"col\">Can you change or cancel?</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Order received</td>\n<td>Payment confirmed; order notes waiting to be read</td>\n<td>Yes, free, within 24 hours of ordering</td>\n</tr>\n<tr>\n<td>Preparing the print</td>\n<td>Reading notes, opening photo links, setting text</td>\n<td>Yes, if still within 24 hours</td>\n</tr>\n<tr>\n<td>Printing and finishing</td>\n<td>Printing the fabric, sewing or assembling, checking</td>\n<td>Usually not; return or exchange after delivery</td>\n</tr>\n<tr>\n<td>Packed and labeled</td>\n<td>Folded, wrapped and waiting for the carrier</td>\n<td>Address redirect may be possible; otherwise return</td>\n</tr>\n<tr>\n<td>Shipped</td>\n<td>With the carrier, tracking email sent</td>\n<td>Carrier redirect only, if the carrier allows it</td>\n</tr>\n</tbody>\n</table>\n<p>Processing from order to carrier normally takes 1–3 business days, so a change that arrives on the second or third day is often too late for that order. That is why we ask for changes in the first 24 hours.</p>\n<h2>8. Gift orders and surprise changes</h2>\n<p>When a pillow or blanket is a gift, the change request usually comes from the buyer, because the order number and confirmation email are in their name. If the recipient contacts us directly, for example to say they have moved, we will ask the buyer to confirm the change from the email address on the order. This protects the surprise and stops anyone else from redirecting a parcel that is not theirs.</p>\n<p>If you want to add a printed message to a gift after ordering, the same 24-hour window applies. Send the exact wording and say where it should go, such as &#8220;under the photo&#8221; or &#8220;on a separate line beneath the names&#8221;.</p>\n<h2>9. Things we cannot change after ordering</h2>\n<ul>\n<li><strong>The payment method.</strong> Payment is taken through checkout. To pay another way, cancel within 24 hours and place a new order.</li>\n<li><strong>The billing email address.</strong> We send updates to the address used at checkout. If you made a typo in it, email us from your correct address with the order number and we will confirm your identity before sending anything there.</li>\n<li><strong>Shipping to a country we do not serve.</strong> We deliver only to the United States, Canada, Australia and New Zealand, so an address outside those countries cannot be used.</li>\n</ul>\n<h2>10. Getting the order notes right the first time</h2>\n<p>Most changes we receive are small spelling slips. A few habits prevent nearly all of them:</p>\n<ul>\n<li>Copy names from a message, a birth announcement or a wedding invitation instead of typing from memory.</li>\n<li>Type accents and special characters, such as &#8220;Zoë&#8221; or &#8220;José&#8221;, exactly. We print them as written.</li>\n<li>Decide on capital letters. &#8220;NANA ROSE&#8221;, &#8220;Nana Rose&#8221; and &#8220;nana rose&#8221; are all printed as typed.</li>\n<li>Write the date in the format you want printed, and say if you want it on a separate line.</li>\n<li>For several items, start each note with the product name, for example &#8220;Sherpa blanket: Milo 2016–2025&#8221;.</li>\n<li>For photos, paste a share link that opens without a login, or write &#8220;photo by email&#8221; and send it to us with the order number.</li>\n</ul>\n<h2>11. Price differences</h2>\n<p>If you change to a larger size or a different style, the new item may cost more. We will tell you the difference before printing and explain how to pay it through a secure checkout link. If the new choice costs less, we refund the difference to your original payment method within 7 days of confirming the change, or add it as store credit if you prefer. Shipping stays free either way.</p>\n<h2>12. Examples</h2>\n<ul>\n<li><strong>&#8220;I typed Lucia instead of Lucía.&#8221;</strong> Email us within 24 hours with the corrected name. We confirm and print the accented version.</li>\n<li><strong>&#8220;I chose a pillow cover but wanted the full pillow.&#8221;</strong> Email us within 24 hours with the new style. We explain the price difference and update the order.</li>\n<li><strong>&#8220;My sister moved last week.&#8221;</strong> Email the new address within 24 hours, including the unit number. We update the shipping label before it is printed.</li>\n<li><strong>&#8220;I ordered two days ago and noticed a typo.&#8221;</strong> Email us anyway. If printing has started, we will offer an exchange after delivery with free return postage.</li>\n</ul>\n<h3>Two orders that should ship together</h3>\n<p>If you place a second order a few hours after the first, for example a matching pillow to go with a blanket, email us with both order numbers within 24 hours of the first order. Where both are still being prepared, we will try to pack them together so they arrive on the same day. If one is already printed, they may ship separately; shipping is free on both either way, and each has its own tracking.</p>\n<p>A tip for gift-givers: write down the order number from your confirmation email somewhere easy to find. Every change request starts with it, and having it ready saves a back-and-forth email when time is short.</p>\n<h2>13. Related pages and contact</h2>\n<p>For delivery times see <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a>. For refunds see the <a href=\"/refund-policy/\">Refund Policy</a>. For order status see <a href=\"/order-tracking/\">Order Tracking</a>. Quick answers are in our <a href=\"/faqs/\">FAQs</a>.</p>\n<p>Email <a href=\"mailto:support@inkhug.shop\">support@inkhug.shop</a>; we reply within 24 hours on business days. Ink Hug, 5498 W Pulley Lane, Herriman, UT 84096, US.</p>\n","visible_characters":10362,"meta_description":"Change names, photos, sizes or the address, or cancel your Ink Hug order free of charge within 24 hours of ordering. Here is how to ask and what happens next.","parent":null,"published_at":"2026-10-29T12:39:04+00:00","updated_at":"2026-10-29T12:39:04+00:00"}}